SECTION A – Objective Type Question Bank
Part 1: 100 Multiple Choice Questions (MCQs)
MCQs (1–25)
- What does PV stand for in solar systems?
A. Power Voltage
B. Photo Voltaic
C. Public Voltage
D. Power Variant
Answer: B - Which component converts DC into AC?
A. Battery
B. Inverter
C. Charge Controller
D. Junction Box
Answer: B - Which mounting type is used on rooftops?
A. Pole Mounting
B. Roof Mounting
C. Ground Mounting
D. Floating Mounting
Answer: B - Which factor most affects solar panel output?
A. Color of roof
B. Sunlight intensity
C. Wire size only
D. Paint thickness
Answer: B - Which direction should solar panels face in Northern Hemisphere?
A. North
B. East
C. South
D. West
Answer: C - Which device protects against overcurrent?
A. Fuse
B. Module
C. Clamp
D. Rail
Answer: A - What is used to store solar energy?
A. Battery
B. Cable tray
C. Junction box
D. SPD only
Answer: A - Which is a common solar inverter type?
A. String inverter
B. Steam inverter
C. Water inverter
D. Diesel inverter
Answer: A - Which test checks insulation quality?
A. IR Test
B. Torque Test
C. Load Test
D. Soil Test
Answer: A - Which device combines multiple DC strings?
A. ACDB
B. DCCB / Combiner Box
C. Meter
D. Transformer
Answer: B - Which study checks shadow effect?
A. Load study
B. Shadow analysis
C. Tax study
D. Wiring study
Answer: B - Which material is commonly used for earthing strip?
A. Wood
B. GI/Copper
C. Rubber
D. Plastic
Answer: B - What is the approximate land required for 1 MW solar plant?
A. 1 acre
B. 2 acres
C. 4–5 acres
D. 10 acres
Answer: C - Which instrument measures solar radiation?
A. Pyranometer
B. Voltmeter
C. Clamp meter
D. Ammeter
Answer: A - Which project chart shows schedule timeline?
A. Pie Chart
B. Gantt Chart
C. Barometer
D. Flow Meter
Answer: B - Which panel type uses sunlight from both sides?
A. Mono panel
B. Bifacial panel
C. Poly panel
D. Thin steel panel
Answer: B - Which parameter indicates actual vs model production?
A. Voltage Ratio
B. Performance Ratio
C. Height Ratio
D. Cable Ratio
Answer: B - Which is NOT a site selection factor?
A. Solar resource
B. Climate
C. Grid availability
D. Curtain color
Answer: D - Which equipment is used for fall safety?
A. Harness
B. Clamp meter
C. Battery
D. Rail
Answer: A - Which test checks module hot spots?
A. Thermal Imaging
B. Water Test
C. Paint Test
D. Sand Test
Answer: A - Which current comes from solar module?
A. AC
B. DC
C. RF
D. Hybrid only
Answer: B - Which body is nodal ministry for renewable energy in India?
A. RBI
B. MNRE
C. SEBI
D. NITI
Answer: B - Which component supports modules physically?
A. Racking Structure
B. Battery
C. Meter
D. Fuse
Answer: A - Which system works without grid?
A. Grid-tie
B. Off-grid
C. Hybrid TV
D. AC only
Answer: B - Which factor increases panel output most?
A. Proper tilt angle
B. Dark paint
C. Thicker cable tray
D. Larger roof door
Answer: A
- Which instrument is commonly used to check voltage?
A. Voltmeter
B. Hammer
C. Spanner
D. Ladder
Answer: A - Which device disconnects solar supply during maintenance?
A. Isolator / Disconnect Switch
B. Rail Clamp
C. Module Frame
D. Tracker
Answer: A - Which mounting type follows the sun automatically?
A. Pole Mount
B. Fixed Tilt
C. Tracking System
D. Roof Hook
Answer: C - Which cable is generally used on DC side of PV plant?
A. Solar DC Cable
B. Telephone Cable
C. Fiber Rope
D. Coaxial Cable
Answer: A - Which component measures exported/imported energy in net metering?
A. Bi-directional Meter
B. Junction Box
C. Clamp
D. Relay Rail
Answer: A - Which test checks correct positive and negative connection?
A. Polarity Test
B. Soil Test
C. Paint Test
D. Noise Test
Answer: A - What is the full form of BOM in project planning?
A. Bill of Materials
B. Bank of Modules
C. Board of Metering
D. Base of Mounting
Answer: A - Which project phase comes after planning?
A. Execution
B. Recycling
C. Closure only
D. Banking
Answer: A - Which structure component supports rails on roofs?
A. Roof Hook
B. Inverter
C. Battery Cell
D. SPD Fuse
Answer: A - Which item protects equipment from surge voltage?
A. SPD
B. Nut Bolt
C. Clamp Meter
D. Purlin
Answer: A - Which study checks whether solar project is financially viable?
A. Feasibility Study
B. Cleaning Study
C. Cable Study
D. Weather Painting Study
Answer: A - Which parameter shows inverter conversion performance?
A. Inverter Efficiency
B. Roof Ratio
C. Wind Ratio
D. Earth Ratio
Answer: A - Which item is mandatory for electrical safety?
A. PPE
B. Wallpaper
C. Tile paint
D. PVC sticker only
Answer: A - Which type of solar project is installed on water bodies?
A. Floating Solar
B. Desert Solar
C. Pole Solar
D. Portable Solar
Answer: A - Which process confirms system is ready to operate?
A. Commissioning
B. Coloring
C. Packaging
D. Drilling
Answer: A - Which side of inverter receives solar panel input?
A. DC Side
B. AC Side
C. Neutral Side
D. Earthing Side
Answer: A - Which side of inverter supplies load/grid output?
A. AC Side
B. DC Side
C. Frame Side
D. Junction Side
Answer: A - Which document gives construction-approved drawings?
A. IFC Drawing
B. ATM Slip
C. Sales Invoice
D. Warranty Card
Answer: A - Which team handles module procurement and delivery?
A. Procurement Team
B. Gardening Team
C. Finance Only
D. Security Only
Answer: A - Which weather factor can reduce generation?
A. Shading
B. Clean glass
C. Correct tilt
D. Tight bolts
Answer: A - Which parameter is checked before connecting string to combiner box?
A. Open Circuit Voltage
B. Paint Shade
C. Roof Color
D. Soil Weight
Answer: A - Which item helps route cables neatly?
A. Cable Tray
B. Module Clamp
C. Ladder Shoe
D. Solar Cell
Answer: A - Which phase includes civil, mechanical and electrical work?
A. Construction Phase
B. Approval Phase
C. Audit Phase
D. Refund Phase
Answer: A - Which maintenance task improves solar panel efficiency?
A. Regular Cleaning
B. Painting Modules
C. Removing Labels
D. Reducing Tilt Daily
Answer: A - Which factor is most important for long life of plant?
A. Proper O&M
B. Random shutdowns
C. Loose wiring
D. Water leakage
Answer: A
- Which material is commonly used for module frame?
A. Aluminium
B. Wood
C. Paper
D. Rubber
Answer: A - Which solar system uses batteries as backup?
A. Off-grid System
B. Streetlight Pole only
C. Grid-only AC system
D. Diesel system
Answer: A - Which device regulates charging of batteries?
A. Charge Controller
B. Junction Box
C. Rail Clamp
D. Tracker Arm
Answer: A - Which document is useful for daily progress reporting?
A. DPR
B. PAN Card
C. Passport
D. Receipt Book
Answer: A - Which factor is checked in rooftop installations?
A. Roof Load Capacity
B. Paint Thickness
C. Window Height
D. Room Size
Answer: A - Which study checks soil condition for ground mount plants?
A. Soil Investigation
B. Battery Test
C. Cable Test
D. IR Scan
Answer: A - Which device protects people from electric shock leakage?
A. Earthing System
B. Nut Bolt
C. Rail Joint
D. Label Sticker
Answer: A - Which of the following is a renewable energy source?
A. Solar Energy
B. Diesel
C. Coal
D. Petrol
Answer: A - Which component is mounted before installing modules?
A. Mounting Structure
B. Net Meter
C. Battery Water
D. Invoice Board
Answer: A - Which phase includes obtaining permits and approvals?
A. Planning Phase
B. Washing Phase
C. Shutdown Phase
D. Disposal Phase
Answer: A - Which organization approves many renewable policies in India?
A. MNRE
B. RBI
C. LIC
D. IRCTC
Answer: A - Which term means total installed power capacity?
A. System Capacity
B. Paint Capacity
C. Roof Capacity
D. Bolt Capacity
Answer: A - Which item is used to tighten bolts to correct value?
A. Torque Wrench
B. Hammer
C. Cutter
D. Spade
Answer: A - Which test verifies grounding resistance?
A. Earth Resistance Test
B. Water Test
C. Weight Test
D. Noise Test
Answer: A - Which component converts sunlight directly into electricity?
A. Solar Cell
B. Transformer
C. Relay
D. Meter Box
Answer: A - Which layout tool is used for schedule planning?
A. Gantt Chart
B. Pie Plate
C. Flow Switch
D. Voltage Card
Answer: A - Which wiring carries power from inverter to load panel?
A. AC Wiring
B. DC String Cable
C. Earthing Wire Only
D. Sensor Cable Only
Answer: A - Which panel technology can capture rear reflected light?
A. Bifacial Panel
B. Wooden Panel
C. PVC Panel
D. Steel Panel
Answer: A - Which maintenance method helps detect hot spots?
A. Thermal Imaging
B. Painting
C. Sweeping Floor
D. Soil Digging
Answer: A - Which component sends data for monitoring?
A. Data Logger
B. Roof Hook
C. Clamp Nut
D. Rail Joint
Answer: A - Which value compares planned vs actual schedule progress?
A. SPI
B. VOC
C. RPM
D. GST
Answer: A - Which value compares earned value with actual cost?
A. CPI
B. Hz
C. Nm
D. Ah
Answer: A - Which system can export extra power to utility grid?
A. Grid-tie System
B. Lantern System
C. Torch System
D. Pump only system
Answer: A - Which item should be avoided on roof during installation?
A. Loose tools and hardware
B. Safety harness
C. Ladder tie
D. PPE gloves
Answer: A - Which condition is unsafe for panel installation?
A. Windy or rainy weather
B. Clear weather
C. Morning sunlight
D. Dry roof surface
Answer: A
- Which document lists all required materials for a project?
A. Bill of Materials
B. Salary Sheet
C. Attendance Register
D. Warranty Card
Answer: A - Which factor is important for module selection?
A. Power Rating
B. Wall Color
C. Cable Tray Size Only
D. Roof Paint
Answer: A - Which parameter indicates module performance under heat?
A. Temperature Coefficient
B. Sound Level
C. Bolt Pressure
D. Roof Width
Answer: A - Which protection device is used in AC distribution board?
A. MCCB
B. Wooden Clamp
C. Rail Hook
D. Glass Strip
Answer: A - Which activity is done before commissioning?
A. Pre-commissioning Tests
B. Roof Painting
C. Landscaping Only
D. Advertising
Answer: A - Which metric equals actual production divided by model production?
A. Performance Ratio
B. Capacity Weight
C. Torque Ratio
D. Voltage Gain
Answer: A - Which component may contain bypass diodes?
A. Junction Box of Module
B. Ladder
C. Rail Clamp
D. Meter Body
Answer: A - Which phase includes vendor selection and sourcing?
A. Procurement Phase
B. Shutdown Phase
C. Recycling Phase
D. Billing Phase
Answer: A - Which chart can show manpower loading?
A. Histogram / Bar Chart
B. Pie Only
C. Voltage Curve
D. Pipe Layout
Answer: A - Which item is essential for module cleaning?
A. Water Availability
B. Roof Paint
C. Cable Label
D. Nut Box
Answer: A - Which device prevents islanding in grid systems?
A. Protection Relay
B. Module Clamp
C. Purlin Bolt
D. Cleaning Brush
Answer: A - Which study estimates yearly energy generation?
A. Energy Yield Analysis
B. Paint Analysis
C. Room Survey
D. Bolt Study
Answer: A - Which phase comes after procurement in lifecycle?
A. Construction / EPC
B. Tax Filing
C. Advertisement
D. Shutdown
Answer: A - Which component is optional in some 1 MW systems?
A. Solar Batteries
B. Solar Modules
C. Inverter
D. Structure
Answer: A - Which unit commonly expresses plant capacity?
A. kW / MW
B. Liter
C. Meter only
D. Kg only
Answer: A - Which issue can result from loose electrical connections?
A. Potential Hazard
B. More shading
C. Better efficiency
D. Less sunlight
Answer: A - Which process ensures correct alignment of structure posts?
A. Verticality Check
B. Painting Check
C. Billing Check
D. Tax Check
Answer: A - Which component sends AC power to the grid?
A. Inverter
B. Module Glass
C. Mounting Clamp
D. Earthing Rod
Answer: A - Which policy supports rooftop solar consumers?
A. Net Metering
B. Rain Metering
C. Heat Billing
D. Fuel Subsidy
Answer: A - Which emerging technology is mentioned in study notes?
A. Perovskite Solar Cells
B. Diesel Cells
C. Plastic Coal Cells
D. Steam Cells
Answer: A - Which system monitors plant output remotely?
A. Remote Monitoring System
B. Ladder System
C. Roof Hook System
D. Fence System
Answer: A - Which item should be calibrated before bolt tightening?
A. Torque Wrench
B. Spanner Handle
C. Hammer Head
D. Ladder Step
Answer: A - Which result is expected from regular maintenance?
A. Reduced Downtime
B. Lower Sunlight
C. Higher Dust
D. Weak Structure
Answer: A - Which project objective includes reducing carbon footprint?
A. Sustainability Goal
B. Painting Goal
C. Lighting Goal Only
D. Storage Goal Only
Answer: A - Which overall benefit comes from proper installation?
A. Higher Efficiency and Long Life
B. Lower Sunlight
C. More Damage
D. Higher Noise
Answer: A
SECTION A – Fill in the Blanks
50 Questions with Answers
(Advanced Diploma Solar Technology – Semester 2| Paper 2)
- PV stands for __________.
Answer: Photovoltaic - Solar panels convert sunlight into __________ energy.
Answer: electrical - The device that converts DC into AC is called an __________.
Answer: inverter - A battery stores __________ for later use.
Answer: energy - Solar panels facing south are preferred in the __________ hemisphere.
Answer: northern - The device used for net metering is a __________ meter.
Answer: bi-directional - The structure used to support solar modules is called __________.
Answer: mounting structure - The angle of solar panel installation is called __________.
Answer: tilt - Excess current protection is provided by a __________.
Answer: fuse - Proper __________ reduces risk of electric shock.
Answer: earthing - The box used to combine multiple DC strings is called a __________ box.
Answer: combiner - The process of checking shadows on panels is called __________ analysis.
Answer: shading - A project time planning chart is called a __________ chart.
Answer: Gantt - The full form of BOM is Bill of __________.
Answer: Materials - Solar systems connected to utility supply are called __________ systems.
Answer: grid-tie - A standalone solar system is called an __________ system.
Answer: off-grid - The Ministry of New and Renewable Energy is abbreviated as __________.
Answer: MNRE - The test used to check cable insulation is __________ test.
Answer: IR - Hot spots in modules can be detected using __________ imaging.
Answer: thermal - The expected life of a solar plant is often more than __________ years.
Answer: 25 - The cable carrying solar panel output usually carries __________ current.
Answer: DC - The cable carrying inverter output usually carries __________ current.
Answer: AC - The process of starting plant operation after testing is called __________.
Answer: commissioning - The amount of sunlight available at a site is called solar __________.
Answer: resource - Roof strength checking is called roof load __________ test.
Answer: capacity - For 1 MW solar plant, about 4 to 5 __________ of land may be required.
Answer: acres - A device used to measure voltage is a __________.
Answer: voltmeter - Loose electrical connections may create __________ hazards.
Answer: fire - Modules should be cleaned __________ to improve efficiency.
Answer: regularly - The support members below modules are called __________.
Answer: rails - The positive and negative connection check is called __________ check.
Answer: polarity - A module can be installed in portrait or __________ orientation.
Answer: landscape - In rooftop systems, panels are fixed using roof hooks and __________.
Answer: clamps - The unit of large plant capacity is __________.
Answer: MW - The unit of small system capacity is __________.
Answer: kW - The ratio of actual to model production is called performance __________.
Answer: ratio - The device that records system data is called a data __________.
Answer: logger - Safety helmets, gloves and shoes are examples of __________.
Answer: PPE - During rainy weather, solar installation should be __________.
Answer: avoided - The document approved for construction is called __________ drawing.
Answer: IFC - Ground-mounted solar plants may need soil __________.
Answer: investigation - The metal strip used in earthing may be GI or __________.
Answer: copper - The process of purchasing equipment is called __________.
Answer: procurement - The cost return period of investment is called __________ period.
Answer: payback - Solar power helps reduce carbon __________.
Answer: emissions - Panels that generate from both front and rear sides are called __________ panels.
Answer: bifacial - The engineer checks bolts using a __________ wrench.
Answer: torque - The phase before construction is called __________ phase.
Answer: planning - The electrical distribution box on AC side is called __________.
Answer: ACDB - Proper maintenance increases system __________.
Answer: lifespan
SECTION A – True or False
50 Questions with Answers
(Advanced Diploma Solar Technology – Semester 2 | Paper 2)
- Solar panels convert sunlight into electrical energy.
Answer: True - An inverter converts AC power into DC power in solar systems.
Answer: False - Earthing helps reduce electric shock risk.
Answer: True - Solar panels should ideally face south in the Northern Hemisphere.
Answer: True - A battery is used to store electrical energy.
Answer: True - A fuse is used for overcurrent protection.
Answer: True - Net metering allows export of excess power to the grid.
Answer: True - A combiner box combines multiple DC strings.
Answer: True - Solar modules generate AC power directly.
Answer: False - Roof load capacity is checked in rooftop projects.
Answer: True - Soil investigation is useful for ground-mounted systems.
Answer: True - Gantt chart is used for project scheduling.
Answer: True - PPE stands for Personal Protective Equipment.
Answer: True - Rainy weather is ideal for solar panel installation.
Answer: False - DC cables are used on the solar panel side.
Answer: True - AC cables are used after inverter output.
Answer: True - Thermal imaging can help detect hot spots.
Answer: True - BOM means Bill of Materials.
Answer: True - A solar plant generally has zero maintenance needs forever.
Answer: False - Proper cleaning can improve solar panel performance.
Answer: True - A bidirectional meter measures import and export energy.
Answer: True - MNRE is related to renewable energy in India.
Answer: True - Commissioning is done after installation and testing.
Answer: True - Solar plants increase carbon emissions.
Answer: False - Earthing resistance should be properly maintained.
Answer: True - Shading can reduce solar panel output.
Answer: True - Inverter efficiency affects overall plant performance.
Answer: True - Panels can be installed in portrait or landscape orientation.
Answer: True - Loose electrical connections can be hazardous.
Answer: True - Off-grid systems may use batteries.
Answer: True - ACDB is used on AC side distribution.
Answer: True - Module mounting structure supports panels mechanically.
Answer: True - Net metering is unrelated to solar rooftop systems.
Answer: False - Solar energy is a renewable source.
Answer: True - A torque wrench is used for proper bolt tightening.
Answer: True - Water availability may be considered for module cleaning.
Answer: True - One MW plant may need around 4–5 acres land.
Answer: True - Performance ratio compares actual and expected generation.
Answer: True - Protective relays may be required for grid synchronization.
Answer: True - Solar modules work better when permanently shaded.
Answer: False - Procurement means purchasing project materials.
Answer: True - DC polarity check is important before connection.
Answer: True - Remote monitoring can track plant generation.
Answer: True - Structural alignment has no importance in solar plants.
Answer: False - Bifacial modules can use reflected rear-side light.
Answer: True - Inverter converts DC to AC for loads/grid.
Answer: True - Solar project planning helps optimize resources.
Answer: True - Regular maintenance can reduce downtime.
Answer: True - Safety harnesses are useful for rooftop installation.
Answer: True - Proper installation can increase system life and efficiency.
Answer: True